IMG_3112
pump track design
ChurchSheep
IMG_2373-PROOF-IMG_2373
IMG_3063-c1
YellowField

Playground Gate Spring – requires further attention

5/2/2024 Internal soft closure mechanism has failed. Repair has been attempted by fitting a retail gate spring. Closure performance may not meet playground inspection recommendations in that the gate does not fully close. Further tightening of the spring tension leads to gate closure being too fast.

May require further attention or replacement.

  • Posted: 6th February 2024